July 2022
The Top Contractors list, published annually, ranks the general contractors, both publicly and privately held, based on construction contracting-specific revenue.
More Information on Top Contractors By Sectors:
View Top Contractors By Sectors
Related Article:
ENR California/Northwest Top Contractors: Mixed Reports From West Coast Firms
Click below for earlier editions:
2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009
Rank 2022/2021 |
Company Location/Website Top Officer |
Largest Project to Break Ground Location Project Value ($ Mil.) |
Market Sectors By % of Revenue** | Regional Rev. 2021 ($ Mil) | |
---|---|---|---|---|---|
1/1 | SWINERTON Concord, Calif. | swinerton.com Eric Foster, CEO |
John Muir Walnut Creek OSC Walnut Creek, Calif. 150.00 |
79 General Building 13 Power 8 Transportation |
2,839.85 | |
2/3 | HENSEL PHELPS* Irvine, Calif. | henselphelps.com Brad Jeanneret, Executive Vice President |
UC Irvine, Irvine Medical Campus Irvine, Calif. 750.00 |
54 General Building 45 Transportation 1 Sewerage/Solid Waste |
2,441.15 | |
3/2 | DPR CONSTRUCTION Redwood City, Calif. | dpr.com Jody Quinton, Executive Vice President |
Confidential Project Duarte, Calif. 246.29 |
49 General Building 42 Industrial Process 9 Telecommunications |
2,225.55 | |
4/5 | DEVCON CONSTRUCTION INC. Milpitas, Calif. | devcon-const.com Gary Filizetti, President |
Not Reported | 100 General Building | 1,757.50 | |
5/6 | MCCARTHY BUILDING COS. Santa Clara, Calif. | mccarthy.com Shaun Sleeth, Regional President |
JCC Stanislaus County Modesto Courthouse Modesto, Calif. 206.00 |
79 General Building 16 Power 3 Industrial Process |
1,715.71 | |
6/4 | HATHAWAY DINWIDDIE CONSTRUCTION CO.* San Francisco | hdcco.com Greg Cosko, President & CEO |
NBCUniversal Campus Project Universal City, Calif. Not Reported |
76 General Building 24 Interior/Tenant Improvements |
1,565.59 | |
7/10 | PCL CONSTRUCTION ENTERPRISES INC.* Glendale, Calif. | pcl.com Deron Brown, President & COO, U.S. Operations |
A-Side Primary Clarifiers Replacement at Plant 2, Contract No. P2-98A Huntington Beach, Calif. 111.41 |
85 General Building 5 Industrial Process 4 Water Supply |
1,548.61 | |
8/9 | CLARK GROUP Irvine, Calif. | clarkconstruction.com Carlos Gonzalez, Division President, Western Region |
LAUSD North Hollywood HS Modernization Los Angeles Not Reported |
80 General Building 20 Transportation |
1,498.81 | |
9/7 | TURNER CONSTRUCTION CO. Anaheim, Calif. | turnerconstruction.com Abrar Sheriff, Executive Vice President |
Intuit Dome Inglewood, Calif. Not Reported |
75 General Building 9 Interior/Tenant Improvements 7 Transportation |
1,377.00 | |
10/15 | KIEWIT CORP.* Fairfield, Calif. | kiewit.com Rick Lanoha, President & CEO |
HDOT - Kapalama Wharf and Dredging Honolulu 340.50 |
55 Transportation 24 Water Supply 12 Sewerage/Solid Waste |
1,055.04 | |
11/8 | WEBCOR San Francisco | webcor.com Jes Pedersen, CEO |
Not Reported | 88 General Building 11 Sewerage/Solid Waste 1 Water Supply |
1,027.79 | |
12/13 | THE WHITING-TURNER CONTRACTING CO. Irvine, Calif. | whiting-turner.com Troy Caldwell, Executive Vice President |
Stanford Bridge Project Santa Clara, Calif. Not Reported |
90 General Building 7 Industrial Process 1 Telecommunications |
964.36 | |
13/17 | LEVEL 10 CONSTRUCTION Sunnyvale, Calif. | level10gc.com Dennis Giles, CEO, President |
Red Hawk Casino Hotel and Entertainment Center Placerville, Calif. 150.00 |
100 General Building | 908.27 | |
14/11 | AECOM TISHMAN | AECOM HUNT* Los Angeles | aecom.com Robert Hart, Executive Vice President, Regional Manager |
Intuit Dome Inglewood, Calif. Not Reported |
80 General Building 18 Transportation 1 Power |
866.91 | |
15/— | KPRS CONSTRUCTION SERVICES INC. Brea, Calif. | kprsinc.com Joel Stensby, President |
Sacramento Industrial Sacramento, Calif. 165.00 |
100 General Building | 827.00 | |
16/14 | BALFOUR BEATTY US San Diego | balfourbeattyus.com Brian Cahill, President, California - US Buildings; Mark Konchar, SVP, Managing Director - US Rail |
Del Sol High School Oxnard, Calif. 178.39 |
50 General Building 35 Transportation 15 Sewerage/Solid Waste |
812.11 | |
17/16 | SKANSKA USA New York | usa.skanska.com Mike Aparicio, Executive Vice President (Civil); James Link, Regional Executive Officer (Building) |
Cordilleras Mental Health Center Redwood City, Calif. 104.00 |
71 Transportation 22 General Building 5 Manufacturing |
769.17 | |
18/18 | FLATIRON CONSTRUCTION INC. Benicia, Calif. | flatironcorp.com Dale Nelson, Senior Vice President |
Anderson Dam Tunnel Morgan Hill, Calif. 161.14 |
88 Transportation 8 Water Supply 3 Sewerage/Solid Waste |
741.99 | |
19/12 | RUDOLPH AND SLETTEN San Carlos, Calif. | rsconstruction.com Jon Foad, President & CEO |
Cedars-Sinai, Marina Del Rey Hospital Marina Del Rey, Calif. 500.00 |
99 General Building 1 Interior/Tenant Improvements |
718.07 | |
20/21 | XL CONSTRUCTION* Milpitas, Calif. | xlconstruction.com Richard Walker, CEO |
Confidential Project Sunnyvale, Calif. 432.00 |
100 General Building | 680.40 | |
21/31 | ABBOTT CONSTRUCTION / LAYTON CONSTRUCTION Irvine, Calif. | laytonconstruction.com David S. Layton, President & CEO |
The Now West Hollywood, Calif. 31.00 |
84 General Building 14 Telecommunications 2 Interior/Tenant Improvements |
629.36 | |
22/20 | PRIMORIS SERVICES CORP. Dallas | prim.com Tim Healy, President, Energy/Renewables |
Not Reported | Not Reported | 619.50 | |
23/23 | C.W. DRIVER COS. Pasadena, Calif. | cwdriver.com Dana Roberts, CEO |
Irvine USD - Solis Park School Irvine, Calif. 55.20 |
100 General Building | 583.64 | |
24/— | TRUEBECK CONSTRUCTION San Mateo, Calif. | truebeck.com David Becker, Co-Founder & CEO; Sean Truesdale, Co-Founder & President |
County of San Mateo, County Office Building 3 (COB3) and Parking Structure Redwood City, Calif. 225.00 |
97 General Building 1 Transportation 1 Manufacturing |
549.70 | |
25/28 | MILLIE AND SEVERSON GENERAL CONTRACTORS* Los Alamitos, Calif. | mandsinc.com Jon Severson, President |
Seefried Industrial Properties New Distribution Center Turlock, Calif. 130.08 |
95 General Building 5 Interior/Tenant Improvements |
546.39 | |
26/22 | THE WALSH GROUP Corona, Calif. | walshgroup.com Matt Walsh, Co-Chairman |
VA San Diego Spinal Cord Injury and Community Living Center San Diego 205.00 |
49 Transportation 27 General Building 21 Sewerage/Solid Waste |
524.57 | |
27/35 | THE PENTA BUILDING GROUP Los Angeles | pentabldggroup.com Paul Dutmer, Director of Los Angeles |
Olive View Fire Alarm and Nurse Call Replacement Los Angeles 43.47 |
94 General Building 6 Interior/Tenant Improvements |
517.82 | |
28/33 | O'NEIL INDUSTRIES INC./W.E. O'NEIL CONST. CO. OF CALIFORNIA El Segundo, Calif. | weoneil.com John Finn, President, WEO CA |
The Aster by Raintree Long Beach, Calif. 69.40 |
90 General Building 7 Manufacturing 2 Power |
506.65 | |
29/— | SHIMMICK* Irvine, Calif. | shimmick.com Andrew Sloane, Executive Vice President |
North City Pure Water Facility San Diego 356.00 |
45 Water Supply 42 Transportation 8 Sewerage/Solid Waste |
490.48 | |
30/19 | BERNARDS San Fernando, Calif. | bernards.com Rick Fochtman, Executive Vice President |
Avenue 34 Los Angeles 135.00 |
98 General Building | 486.56 | |
31/24 | CAHILL CONTRACTORS LLC San Francisco | cahill-sf.com Kathryn Cahill Thompson, CEO |
Not Reported | 97 General Building 2 Interior/Tenant Improvements 2 Master-Planned Development/Site Infrastructure |
473.40 | |
32/26 | MATT CONSTRUCTION Santa Fe Springs, Calif. | mattconstruction.com Steven Matt, CEO & Chairman |
Not Reported | 100 General Building | 443.00 | |
33/27 | SUNDT CONSTRUCTION INC.* Irvine, Calif. | sundt.com Ryan Nessen, Senior Vice President, Building, California |
CSU Fullerton Student Housing Expansion Fullerton, Calif. 108.00 |
61 General Building 32 Sewerage/Solid Waste 6 Transportation |
426.65 | |
34/32 | NIBBI BROTHERS GENERAL CONTRACTORS San Francisco | nibbi.com Robert L. Nibbi, President & CEO |
4840 Mission Street San Francisco 78.05 |
100 General Building | 412.49 | |
35/— | DOME CONSTRUCTION CORP.* South San Francisco, Calif. | domebuilds.com Rob Lynch, President |
Confidential Project San Jose, Calif. 57.58 |
82 General Building 17 Interior/Tenant Improvements 1 Manufacturing |
400.00 | |
36/39 | LYLES CONSTRUCTION GROUP Fresno, Calif. | lylesgroup.com Rich Nemmer, President & CEO |
JWPCP Replacement of Cryogenic Plants 1 and 2 Los Angeles 14.93 |
65 Sewerage/Solid Waste 12 Water Supply 12 General Building |
388.76 | |
37/— | SUKUT CONSTRUCTION* Santa Ana, Calif. | sukut.com Steve Yurosek, CEO & President |
Not Reported | 31 Hazardous Waste 22 Water Supply 21 Sewerage/Solid Waste |
384.49 | |
38/30 | OHLA USA INC. Irvine, Calif. | ohla-usa.com Tony Bagheri, EVP, Western Region |
Not Reported | 83 Transportation 12 Water Supply 5 Sewerage/Solid Waste |
382.00 | |
39/34 | PLANT CONSTRUCTION CO. LP San Francisco | plantconstruction.com Chris Rivielle, President & CEO |
300 Lakeside Oakland, Calif. Not Reported |
100 General Building | 379.54 | |
40/40 | DEACON CONSTRUCTION LLC* Citrus Heights, Calif. | deacon.com John Clouse, Executive Vice President, General Manager |
Hyatt Place & House Sacramento, Calif. 30.00 |
100 General Building | 367.29 | |
41/— | GILBANE BUILDING CO. San Jose, Calif. | gilbaneco.com Casey Michaelis, Vice President, Area Manager |
Cadence Building 5 San Jose, Calif. 20.00 |
85 General Building 6 Petroleum 4 Transportation |
366.34 | |
42/36 | C. OVERAA & CO. Richmond, Calif. | overaa.com Christopher Manning, CEO |
FedEx Warehouse Richmond, Calif. 47.57 |
43 General Building 19 Sewerage/Solid Waste 17 Water Supply |
357.54 | |
43/29 | SKYLINE CONSTRUCTION* San Francisco | skylineconstruction.build Jessica Carps, CEO |
Not Reported | 90 Interior/Tenant Improvements 10 General Building |
341.91 | |
44/— | BROWN CONSTRUCTION INC.* West Sacramento, Calif. | brown-construction.com Ron Brown, President & CEO |
Not Reported | 100 General Building | 298.00 | |
45/25 | MORLEY BUILDERS Santa Monica, Calif. | morleybuilders.com Charles Muttillo, President |
UCI East Campus - Phase IV-B Irvine, Calif. 93.00 |
100 General Building | 294.00 | |
46/59 | ARCO CONSTRUCTION COS. St. Louis | arcoconstruction.com Jeff Cook, Co-Founder |
Exeter HCC3 Common California Not Reported |
100 General Building | 287.08 | |
47/47 | HOLDER CONSTRUCTION San Jose, Calif. | holderconstruction.com Gavin Kalley, Senior Vice President |
Not Reported | 84 Telecommunications 16 General Building |
278.85 | |
48/— | LANE INDUSTRIES INC. Henderson, Nev. | laneconstruct.com Jason McLear, Vice President, Construction |
Not Reported | 100 Transportation | 277.89 | |
49/50 | BURNS & MCDONNELL Brea, Calif. | burnsmcd.com Rashmi Menon, Vice President, General Manager, California |
Confidential Project Palmdale, Calif. Not Reported |
31 Industrial Process 20 Manufacturing 20 Power |
274.57 | |
50/37 | BCCI CONSTRUCTION CO. San Francisco | bcciconst.com Michael Scribner, CEO |
Eataly Silicon Valley San Jose, Calif. Not Reported |
100 General Building | 263.92 | |
51/57 | HASKELL Jacksonville, Fla. | haskell.com Jim O'Leary, Chairman, CEO & President |
Not Reported | 89 Industrial Process 10 General Building 1 Manufacturing |
258.09 | |
52/43 | BLACH CONSTRUCTION* San Jose, Calif. | blach.com Daniel L. Rogers, President |
Immanuel Sobrato Community San Jose, Calif. 47.80 |
99 General Building 1 Interior/Tenant Improvements |
246.51 | |
53/— | TRAYLOR CONSTRUCTION GROUP INC. Long Beach, Calif. | traylor.cpm Michael T. Traylor, Co-President |
Not Reported | 88 Transportation 12 Water Supply |
246.32 | |
54/38 | CLUNE CONSTRUCTION Los Angeles | clunegc.com Randy Starbird, Executive Managing Director, President West Region |
Confidential Project Irvine, Calif. 23.02 |
94 Interior/Tenant Improvements 6 Telecommunications |
245.47 | |
55/44 | KITCHELL CORP. San Diego | kitchell.com Michael Wolfe, Regional VP - Kitchell Contractors; Wendy Cohen, President Kitchell CEM |
UCSD Living and Learning Center San Diego 495.70 |
100 General Building | 235.50 | |
56/41 | R.D. OLSON CONSTRUCTION Irvine, Calif. | rdolson.com William J. Wilhelm, President |
Esperanza at Duarte Station Duarte, Calif. 84.06 |
100 General Building | 221.00 | |
57/51 | DUKE CONSTRUCTION Indianapolis | dukerealty.com Pete Harrington, EVP, Construction |
Not Reported | 86 General Building 13 Interior/Tenant Improvements 1 Other Project Types |
218.24 | |
58/— | HARPER CONSTRUCTION CO. San Diego | harperconstruction.com Jeffrey Harper, President |
Michelson Mission Systems Integration Laboratory P1903 NAWS China Lake, Calif. 110.65 |
100 General Building | 203.67 | |
59/62 | MILENDER WHITE INC. Newport Beach, Calif. | milenderwhite.com Adam Mack, Executive Vice President, District Manager (Southern California) |
Hub on Campus LA-Figueroa Los Angeles 61.34 |
100 General Building | 181.00 | |
60/49 | AUSTIN INDUSTRIES Los Angeles | austin-ind.com Thomas Conroy, VP - Western Region, Austin Commercial |
Caltech Mead Lab Pasadena, Calif. 3.00 |
98 Transportation 2 General Building |
176.07 | |
61/45 | MANSON CONSTRUCTION CO.* Long Beach, Calif. | mansonconstruction.com Jim McNally, COO, Executive Vice President |
Not Reported | 100 Transportation | 160.05 | |
62/58 | HITT CONTRACTING Santa Clara, Calif. | hitt.com John Kane, Senior Vice President |
Confidential Data Center Project Hayward, Calif. 93.64 |
70 Telecommunications 22 General Building 8 Interior/Tenant Improvements |
157.19 | |
63/54 | RYAN COS. US* La Jolla, Calif. | ryancompanies.com Mike Mahoney, President, West Region |
Crest Beverage San Diego San Diego 56.73 |
100 General Building | 155.46 | |
64/46 | MOOREFIELD CONSTRUCTION INC.* Santa Ana, Calif. | moorefieldconstruction.com Mike Moorefield, President |
Not Reported | 100 General Building | 138.00 | |
65/42 | BIG-D CONSTRUCTION CORP. Salt Lake City | big-d.com Rob Moore, Executive Chairman |
Airpark 599 Building 4 Stockton , Calif. 64.00 |
100 General Building | 137.29 | |
66/48 | PINNER CONSTRUCTION CO. Anaheim, Calif. | pinnerconstruction.com Dirk Griffin, CEO |
San Pedro High School Comprehensive Modernization San Pedro, Calif. 171.82 |
100 General Building | 133.59 | |
67/— | OTTO CONSTRUCTION Sacramento, Calif. | ottoconstruction.com Allison Otto, President & CEO |
CSU Maritime Academy Mayo Hall Renovation and Addition Vallejo, Calif. 20.04 |
100 General Building | 130.77 | |
68/53 | SHAWMUT DESIGN AND CONSTRUCTION* Los Angeles | shawmut.com Greg Skalaski, Executive Vice President, West Region |
Confidential Tech Project Los Angeles 17.66 |
100 General Building | 125.08 | |
69/61 | CSI CONSTRUCTION CO.* Foothill Ranch, Calif. | csigc.com Joe Hall, Vice President |
The Ranch Apartments Murrieta, Calif. 70.00 |
100 General Building | 122.46 | |
70/60 | VCC LLC Irvine, Calif. | vccusa.com Don Davis, Executive Vice President |
Public Storage North Hollywood North Hollywood, Calif. 12.80 |
100 General Building | 113.28 | |
71/— | PREVOST CONSTRUCTION Carlsbad, Calif. | prevostconstruction.com Jamie Prevost, CEO & President |
Quidel Rutherford Carlsbad, Calif. 63.42 |
69 Manufacturing 31 General Building |
96.60 | |
72/56 | JTM CONSTRUCTION GROUP INC. (AN AFFILIATE OF J.T. MAGEN & CO.) Culver City, Calif. | jtmagen.com Steven Mount, President |
Neuehouse Venice, Calif. 10.50 |
83 Telecommunications 17 General Building |
82.94 | |
73/64 | GARNEY HOLDING CO. Tracy, Calif. | garney.com Bill E. Williams, Vice President |
Castenada No. 1 and No. 2 Reservoirs Rehabilitation, Glen Reservoir Rehabilitation and Mulholland Reservoirs Roof Maintenance San Ramon, Calif. 19.00 |
56 Sewerage/Solid Waste 44 Water Supply |
60.57 | |
74/67 | AGI GENERAL CONTRACTING Stanton, Calif. | agigc.com Chris Gautreau, President |
Roberto S. Juarez Health Center Oxnard, Calif. 15.80 |
100 General Building | 47.12 | |
75/— | BERGMANKPRS Brea, Calif. | bergmankprs.com Mark C. Bergman, Managing Member |
Tapo Canyon Simi Valley, Calif. 36.55 |
100 General Building 94 Interior/Tenant Improvements 6 Master-Planned Development/Site Infrastructure |
42.08 | |
76/68 | RBA BUILDERS INC. Huntington Beach, Calif. | rbabinc.com Robert Anderson, CEO |
Northrop Grumman Consolidated Control Room, Phase 2 Redondo Beach, Calif. 7.84 |
100 General Building | 41.10 | |
77/66 | GHIRARDELLI ASSOCIATES INC San Jose, Calif. | ghirardelliassoc.com Randall Bruner, CEO |
Not Reported | 88 Transportation 11 Hazardous Waste 1 General Building |
35.37 | |
78/55 | GRAYCOR INC.* San Jose, Calif. | graycor.com Tim Hanifin, President |
Not Reported | 100 General Building | 34.98 | |
79/65 | TIS CONSTRUCTION SERVICES INC. Carson, Calif. | tisusa.com Farrel Stevins, CEO |
Marina Towers 6th Floor Marina Del Rey, Calif. 2.09 |
100 General Building | 33.97 | |
80/69 | SLETTEN Las Vegas | slettencompanies.com Dane Carter, Senior Vice President |
Trinity County Sheriff Dept. Facility Weaverville, Calif. 19.62 |
92 General Building 8 Power |
30.90 | |
81/72 | DENNIS GROUP Carlsbad, Calif. | dennisgroup.com Kyle Kartchner, Senior Partner |
Not Reported | 100 Industrial Process | 29.18 | |
82/71 | IPS-INTEGRATED PROJECT SERVICES LLC Irvine, Calif. | ipsdb.com Patrick Bucklen, Vice President, Regional |
Teknova VTM Clean Room Hollister, Calif. 25.00 |
100 Industrial Process | 27.99 | |
83/70 | SCHWAGER DAVIS INC. San Jose, Calif. | schwagerdavis.com Mike Schwager, President |
Not Reported | 91 Transportation 9 General Building |
20.56 | |